[1]
Khan, S. and Anwar, D.S. 2026. Analyzing Construction Delays: A Cost Analysis of The Kohat-Karak N-55 Highway. Journal of Economic Sciences. 5, 1 (May 2026), 71–92. DOI:https://doi.org/10.55603/jes.v5i1.a5.