Khan, S., & Anwar, D. S. (2026). Analyzing Construction Delays: A Cost Analysis of The Kohat-Karak N-55 Highway. Journal of Economic Sciences, 5(1), 71–92. https://doi.org/10.55603/jes.v5i1.a5