KHAN, Sherbaz; ANWAR, Dr Saba. Analyzing Construction Delays: A Cost Analysis of The Kohat-Karak N-55 Highway. Journal of Economic Sciences, [S. l.], v. 5, n. 1, p. 71–92, 2026. DOI: 10.55603/jes.v5i1.a5. Disponível em: https://jesciences.com/index.php/jes/article/view/223. Acesso em: 9 may. 2026.