Khan, Sherbaz, and Dr Saba Anwar. 2026. “Analyzing Construction Delays: A Cost Analysis of The Kohat-Karak N-55 Highway”. Journal of Economic Sciences 5 (1):71-92. https://doi.org/10.55603/jes.v5i1.a5.