Khan, S. and Anwar, D. S. (2026) “Analyzing Construction Delays: A Cost Analysis of The Kohat-Karak N-55 Highway”, Journal of Economic Sciences, 5(1), pp. 71–92. doi: 10.55603/jes.v5i1.a5.