Khan, Sherbaz, and Dr Saba Anwar. “Analyzing Construction Delays: A Cost Analysis of The Kohat-Karak N-55 Highway”. Journal of Economic Sciences, vol. 5, no. 1, May 2026, pp. 71-92, doi:10.55603/jes.v5i1.a5.