Khan, Sherbaz, and Dr Saba Anwar. “Analyzing Construction Delays: A Cost Analysis of The Kohat-Karak N-55 Highway”. Journal of Economic Sciences 5, no. 1 (May 8, 2026): 71–92. Accessed May 9, 2026. https://jesciences.com/index.php/jes/article/view/223.